Home   Properties Search   Contact Us   News   Advice   Services   Gallery   Towns&Regions   FAQ   Links   Site Map   Log In   Travel 

 
 

Tel: 0845 0548035

Local rate calls from the UK

Quick Launch       
currency converter
the weather today
bulgarian embassy
balkanholidays.co.uk
britishairways.com
bulgarian translator
buy a map of bulgaria
pine direct from bulgaria

 

 


Bulgaria

 

 


log houses in batovo

 

 


Picture Gallery

 

Log Houses - Building Stages
 
    Material preparation (1-2 weeks)

    The log houses are built from high quality pine material. The row pine is turned into logs with 22cm  diameter, the  beams than are treated with soaking preparations, in order to protect the wood from insects, termites, rotten caused by micelles and the so called blue stain of the wood.

 
    Foundations (3-4 week)

    By plan every log house has concrete foundation  in order to meet the  building requirements and earthquake norms for the particular region. Only when the concrete foundation is in place and settled the erecting of the wooden construction can take place.

 
    Building up of the house(5-6 week)

    The walls are done by  crossed beams 22 cm in diameter. The construction of a log house is 15 times lighter then the one used in conventional building. That is way this construction is very appropriate in region where there is a risk of landslides . The unique sructure of the walls and the insulation between the beams make the house extremely soundproof.

 
    Roof construction (7th week)

    The roof is made from wooden stems construction  and is the last stage from the rough building of the log  house.

 
    Water and electricity  (8th week)

    The cables are mainly in spaces between the walls and under the floor. The cables are placed in special double insulated tubes to comply with the building regulations. The polypropylene water pipes do not corrode.

 
    Insulation (9 week)

    The materials and products used for insulation of the houses are from established companies  proved to be the best producers of insulation materials. This high level insulation makes the house  secure and cosy.

 
    Roof finishing and  windows (10-11 week)

    There is a wide choice for roof finishing. It could be completed with tiles, slates  or other materials  in accordance to the client preferences. The windows are double glassed and up to the europian standards.

 
    Finishing (12-17 week)

    Sanding, staining and lacquering in your preferred colours are the last finishing touches turning the log house in your dream home.

 
 
 

 

  Sample Models & Individual Projects

  Log Houses

  Picture Gallery

  Prices

 

  log houses in batovo

 

  more properties in Bulgaria


properties. contact us. news. advice. services. pictures gallery. towns and regions. faq. links. log in. travel

Copyright В© 2005 BlackSeaEstates.Net - The Bulgarian Property Company. All rights reserved!

Site Map

search our properties list
information about our company
read news about Bulgaria
advice on purchasing propert
bulgarian pictures gallery
bulgairan towns and regions info
frequently asked questions
links
only for agents and new ads
the services we offer
travel information
sell your property

 


Building Stages


Sample Models


Individual Projects

Interior Furnishing




Garden Furniture