The
complex of holiday studios “Rose Residence” is located in the
western part of the resort “Sunny Beach”. It is situated over a
regulated landed property VII -249 in district 5201 from the
building-regulation plan of the complex on a total area of 2 982
sq.m.
The apartment complex was
projected as flats for seasonal use (all year round use is also
possible). The residential area is compact designed in one room
apartments – type “studio”. The flats are economical having in
mind their purpose: a large living room with a kitchenette and a
place for dining, anteroom with a wardrobe. There is an
individual bathroom with a bath-tub. It is being envisioned on
necessity living room is being adapted as extra space starts
sleeping on /in shape-2 + 2 persons/.
The project is composed in
V-figurative capacity, located in the south-western part of the
area, with the purpose to obtain maximum free space area,
necessary for disposing the infrastructure of the complex.
In the central part of the
building are situated 12 apartments which are projected,
together with one bedroom and a living room.
Because of their seaside
characteristics, the terraces are large and by means of the
sliding doors when opened, they become a natural extension to
the living rooms.
The architectural chart is
cleared and it is discharged of unnecessary detail. The fresh
color decision gives the project a modern appearance and style.
The building is without a
basement, and consist 6 floors, the last is in part bevel.
The studio will be
accessible from a controlled entrance, staircase and elevator,
located central in the territory of the building.
The construction is solid
– armored concrete with a scaffolding beamless construction
system.
The walls are filled with
ceramic bricks, protected from outside with the necessary heat
insulation – with regard to the standard. The inner walls will
be worked with materials without wet processes. The facades will
be shaped with mineral water-resist plasters, wood, metal etc.
according to the architectural details. The doors and windows
will be PVC with a thermal bridge, which will contribute to the
general comfort in the building.
There will also be
available the necessary communication, information and security
installations; cable TV, Internet, as well as a preparation for
the assembly of the air-conditioning installation.
The courtyard will be
abundantly planted with trees and shrubs. The accessibility is
controlled through the main entrance of the building. An outdoor
swimming pool is designed together with children’s section.
There is also a pool-bar with a small shop, which are naturally
connected with the pool and the building.
The Entrance at the
building site happens true the main entrance from the street
from the west by east facing. There is a separate area for a
small parking lot at the front of main entrance of the complex,
as well as from the northern part of the complex.
Falling is possible to be
effected by the adjacent located hotel complex “Jasmine
Residence and therefore through the overall area of the hotels
Jasmine and “Kokiche”, to the street from north and east as
well.
COMPLETION OF HOLIDAY
STUDIOS ROSE RESIDENCE: 30.05.2008
|
Stage 1 |
21.03.2007 -
Turning the first sod |
|
Stage 2 |
21.03.2007 -
10.04.2007 - Digging. Terracing the terrain. Moulding of
the ground floor and the first plate. |
|
Stage 3 |
10.04.2007 –
20.04.2007 - Completion of the rough construction works
of 1st floor. |
|
Stage 4 |
20.04.2007–01.05.2007 - Completion of the construction
works of 2nd floor. |
|
Stage 5 |
01.05.2007-
Temporary interruption of the construction works during
the summer tourist season in conformity with Mayor's
Ordinance of Nessebar Municipality. |
|
Stage 6 |
30.09.2007-15.12.2007 - Completion of the construction
works of floors 3-6.
Signing of the Act for approving the construction of the
building up to stage "rough construction works" /Act
Pattern 14/. |
|
Stage 7 |
15.12.2007–31.03.2008 - Construction of all barrage
walls, building up the roof construction, setting up all
installations, windows and doors, insulations, outside
plastering. Finishing works. |
|
Stage 8 |
Not later than
15.05.2008 - Completing all finishing works. Final
completion of the building.
Signing of Act Pattern 15. |
|
Stage 9 |
15.05.2008–30.05.2008 - Final completion of the vertical
planning of the building. Organization activities to
prepare the exploitation of the building site for the
summer tourist season. |
|
Stage 10 |
30.05.2008 -
Delivering the apatments to their owners.
Issuing a Certificate for the utilization of the
building site /Act Pattern 16/. |