|
Boyana Vista Complex - block 1,
Manastirski Livadi quarter, Sofia

Boyana Vista
Complex is going to be built in the unique in terms of prospects and
conditions Sofia district "Manastirski Livadi - West" where:
-
construction
is entirely new development and in coordination with the building plan
which turns the area into a residential area of its own style;
-
the building
density is low - all green areas are scheduled for restoration after
each building is completed. There will also be playing grounds,
swimming-pools and additional landscaping;
-
the proximity
of the Vitosha mountain offers fresher air and a spectacular view;
-
there is a
direct high-speed route in both directions of Bulgaria blvd. - both to
the city centre and to the ring-road;
-
the projects
are among the first in Sofia coordinated with the completed gasification
of the area.
Location
The building is located at Bulgarska legiya Str. and Vasilashko ezero Str.
Most of the apartments have a southeast view to the mountain while the rest
offer a panoramic view to the city and the inner courtyard of the building.
The neighbourhood is calm and quiet. The Billa hypermarket is very close and
Bulgaria blvd. provides quick and comfortable communication to the city
centre. Bulgarska legiya Str. reaches the boulevard in both directions.
The building includes 3 separate entrances, has 6 residential floors, 1
ground floor with shops, office and garages and one underground garages
level.
The building is of superior quality, clad with first-rate stone, high
quality 4-chambers windows and luxurious lifts.
Technical
features
Construction type: - monolithic, reinforced concrete, beamless,
allowing changes in the floor plans
Masonry: - bricks
Insulation: Basement walls - waterproofing and thermal insulation
Exterior supporting walls - thermal insulation
Reinforced concrete slabs - thermal insulation
Terraces, balconies - waterproofing and thermal insulation
Roof - waterproofing and thermal insulation
Facade: - thermal insulation, glass-fiber mesh, colour mineral
plaster, granite socle, stone cladding - travertine, polished limestone
Roofs: - Bramac
Lifts: - hydraulic, luxurious, starting from the garages
Joinery works of all residential objects: - PVC - 3- and 4-chambers
profile and sealed double-glazed units
Joinery works of the public objects: - PVC - 3- and 4-chambers
profile and sealed double-glazed units
Entrance doors of the buildings: - PVC, with installed post boxes and
electrical lock
Intercom: - bells at every entrance
Staircases: - landings and stairs - granite tiles; - walls and
ceilings - latex paint
Exterior
Upon completion of
construction a playing ground and landscaping of the vacant areas are
scheduled.
Interior
Entrance doors of the flats - armoured
Interior doors - laminated
Walls and ceilings - putty
Interior doors and ceilings of the cellars - whitewash plaster
Apartments floors - cement putty
Sanitary premises - putty and plaster
Balcony rails - architectural design
Garages - cement putty
Electrical installation:
- heavy current and lighting - completed according to BDS (Bulgarian State
Standard)
- light current mains - telephone, aerial installation route and cable
television
- bells intercom installation and fire-precaution installation of the
underground garages
Plumbing installation:
- polypropylene pipes
- cold water meters
Sewerage system:
- PVC pipes
Ventilation:
- PVC pipes
- installed ventilation grids by design
- ventilators
Heating:
- independent local split system for individual heating of each apartment
- polypropylene pipe installation
- metal radiators with thermostat valves
- connection to gas installation for water-heater
Gas installation:
- interior natural gas installation next to a gas aggregate (cauldron
boiler) and connected to an exterior gas pipeline
- gas meters for every apartment after joining and boards for every entrance |